This topic contains a solution. Click here to go to the answer

Author Question: Which of the following is a characteristic of large-scale systems development projects? A) short ... (Read 75 times)

urbanoutfitters

  • Hero Member
  • *****
  • Posts: 530
Which of the following is a characteristic of large-scale systems development projects?
 
  A) short development intervals
  B) single development site
  C) avoidance of system localization
  D) 50-100 development team members

Question 2

Microsoft Access provides a default table display for creating a data entry form.
 
  Indicate whether the statement is true or false



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

nguyenhoanhat

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

D

Answer to Question 2

TRUE





 

Did you know?

Alzheimer's disease affects only about 10% of people older than 65 years of age. Most forms of decreased mental function and dementia are caused by disuse (letting the mind get lazy).

Did you know?

Inotropic therapy does not have a role in the treatment of most heart failure patients. These drugs can make patients feel and function better but usually do not lengthen the predicted length of their lives.

Did you know?

Intradermal injections are somewhat difficult to correctly administer because the skin layers are so thin that it is easy to accidentally punch through to the deeper subcutaneous layer.

Did you know?

Alcohol acts as a diuretic. Eight ounces of water is needed to metabolize just 1 ounce of alcohol.

Did you know?

IgA antibodies protect body surfaces exposed to outside foreign substances. IgG antibodies are found in all body fluids. IgM antibodies are the first type of antibody made in response to an infection. IgE antibody levels are often high in people with allergies. IgD antibodies are found in tissues lining the abdomen and chest.

For a complete list of videos, visit our video library