Homework Clinic

Social Science Clinic => Business => Management => Topic started by: Starlight on Dec 3, 2019

Title: What are predetermined time standards?
Post by: Starlight on Dec 3, 2019

Question 1

How is the statistical tool of adequate sample sizing used in work measurement?

Question 2

What are predetermined time standards?
Title: What are predetermined time standards?
Post by: chevyboi1976 on Dec 3, 2019

Answer 1

The two applications are in time studies and in work sampling. Both determine how many measurements need to be taken before specified levels of accuracy and confidence are achieved. This prevents users of time studies and work sampling from drawing faulty conclusions from too-small samples.

Answer 2

Predetermined time standards divide manual work into small basic elements that already have established times.