Author Question: The longest path in a project is the ________ that determines the shortest time required to complete ... (Read 54 times)

Mimi

  • Hero Member
  • *****
  • Posts: 542
The longest path in a project is the ________ that determines the shortest time required to complete the project.
 
  A) critical path
  B) shortest route
  C) shortcut
  D) road map

Question 2

Distinguish between tacit and explicit knowledge.
 
  What will be an ideal response?



jasonq

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

Tacit knowledge exists within a person's mind and is private and unique to each person. Explicit knowledge has been articulated, codified, and made public.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

Did you know?

In 2012, nearly 24 milliion Americans, aged 12 and older, had abused an illicit drug, according to the National Institute on Drug Abuse (NIDA).

Did you know?

Dogs have been used in studies to detect various cancers in human subjects. They have been trained to sniff breath samples from humans that were collected by having them breathe into special tubes. These people included 55 lung cancer patients, 31 breast cancer patients, and 83 cancer-free patients. The dogs detected 54 of the 55 lung cancer patients as having cancer, detected 28 of the 31 breast cancer patients, and gave only three false-positive results (detecting cancer in people who didn't have it).

Did you know?

The most destructive flu epidemic of all times in recorded history occurred in 1918, with approximately 20 million deaths worldwide.

Did you know?

Common abbreviations that cause medication errors include U (unit), mg (milligram), QD (every day), SC (subcutaneous), TIW (three times per week), D/C (discharge or discontinue), HS (at bedtime or "hours of sleep"), cc (cubic centimeters), and AU (each ear).

For a complete list of videos, visit our video library