This topic contains a solution. Click here to go to the answer

Author Question: The continuous quality improvement (CQI) coordinator is establishing quality measures for a unit. ... (Read 98 times)

genevieve1028

  • Hero Member
  • *****
  • Posts: 601
The continuous quality improvement (CQI) coordinator is establishing quality measures for a unit.
 
  These measures would be written according to which criteria? Note: Credit will be given only if all correct choices and no incorrect choices are selected. Standard Text: Select all that apply. 1. The CQI coordinator has read two research studies that show the process improves client outcomes.
  2. The CQI coordinator has evidence that a particular practice is effective in decreasing length of stay.
  3. The CQI coordinator has used the process in practice for over 2 years.
  4. The process being measured produces a desirable outcome.
  5. There are very few unexpected bad effects from the process.

Question 2

Which data would be of most interest to an organization using Lean Six Sigma as a means of quality improvement?
 
  1. Eighty-five percent of call lights are answered within 4 minutes.
  2. Results of pain medication administration are documented 95 percent of the time.
  3. Nursing overtime hours increased by 25 percent in the last quarter.
  4. In the last 6 months, overall client satisfaction scores have increased by 15 percent.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

mcarey591

  • Sr. Member
  • ****
  • Posts: 365
Answer to Question 1

1,2,4,5
Rationale 1: The measure must be based in research that shows the process leads to improved outcomes. More than one research study is required for documentation.
Rationale 2: Quality measures should document that evidence-based practice was given.
Rationale 3: Anecdotal information or single-nurse-practice information is not sufficient evidence for writing a quality measure.
Rationale 4: The monitor is written in the positive, meaning that the process is desirable.
Rationale 5: The process should have minimal or no unintended adverse effects.
Global Rationale:

Answer to Question 2

3
Rationale 1: Lean Six Sigma is focused on improving process flow and eliminating waste.
Rationale 2: Lean Six Sigma is focused on improving process flow and eliminating waste.
Rationale 3: Lean Six Sigma focuses on eliminating waste, such as an increase in expensive overtime wages, and would focus on processes that may be allowing this to occur.
Rationale 4: Lean Six Sigma focuses on reducing waste.
Global Rationale:




genevieve1028

  • Member
  • Posts: 601
Reply 2 on: Jul 8, 2018
Gracias!


dreamfighter72

  • Member
  • Posts: 355
Reply 3 on: Yesterday
Excellent

 

Did you know?

HIV testing reach is still limited. An estimated 40% of people with HIV (more than 14 million) remain undiagnosed and do not know their infection status.

Did you know?

The most common childhood diseases include croup, chickenpox, ear infections, flu, pneumonia, ringworm, respiratory syncytial virus, scabies, head lice, and asthma.

Did you know?

The eye muscles are the most active muscles in the whole body. The external muscles that move the eyes are the strongest muscles in the human body for the job they have to do. They are 100 times more powerful than they need to be.

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

The average older adult in the United States takes five prescription drugs per day. Half of these drugs contain a sedative. Alcohol should therefore be avoided by most senior citizens because of the dangerous interactions between alcohol and sedatives.

For a complete list of videos, visit our video library