Author Question: After constructing a new factory, the cost of building the factory is a A) past cost. B) sunk ... (Read 64 times)

kodithompson

  • Hero Member
  • *****
  • Posts: 566
After constructing a new factory, the cost of building the factory is a
 
  A) past cost.
  B) sunk cost.
  C) variable cost.
  D) None of the above answers are correct.

Question 2

In the above figure, at point b on the demand curve, a price cut of one dollar will
 
  A) increase total revenue.
  B) decrease total revenue.
  C) leave total revenue unchanged.
  D) have an indeterminate effect on total revenue.



IRincones

  • Sr. Member
  • ****
  • Posts: 321
Answer to Question 1

B

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Signs and symptoms that may signify an eye tumor include general blurred vision, bulging eye(s), double vision, a sensation of a foreign body in the eye(s), iris defects, limited ability to move the eyelid(s), limited ability to move the eye(s), pain or discomfort in or around the eyes or eyelids, red or pink eyes, white or cloud spots on the eye(s), colored spots on the eyelid(s), swelling around the eyes, swollen eyelid(s), and general vision loss.

Did you know?

The lipid bilayer is made of phospholipids. They are arranged in a double layer because one of their ends is attracted to water while the other is repelled by water.

Did you know?

Multiple experimental evidences have confirmed that at the molecular level, cancer is caused by lesions in cellular DNA.

Did you know?

Certain chemicals, after ingestion, can be converted by the body into cyanide. Most of these chemicals have been removed from the market, but some old nail polish remover, solvents, and plastics manufacturing solutions can contain these substances.

Did you know?

About 3% of all pregnant women will give birth to twins, which is an increase in rate of nearly 60% since the early 1980s.

For a complete list of videos, visit our video library