Author Question: Establishing cost control is part of the _____ phase. A) bidding B) pre-construction C) ... (Read 23 times)

Anajune7

  • Hero Member
  • *****
  • Posts: 574
Establishing cost control is part of the _____ phase.
 
  A) bidding
  B) pre-construction
  C) construction
  D) closeout

Question 2

Which delivery system involves the owner, architect/engineer, and general contractor?
 
  A) The traditional contract delivery system
  B) The design-build system
  C) The construction management system (CM)
  D) The engineering-procurement-construction (E-P-C) system



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

harveenkau8139

  • Sr. Member
  • ****
  • Posts: 304
Answer to Question 1

Answer: B

Answer to Question 2

Answer: A





 

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

Oxytocin is recommended only for pregnancies that have a medical reason for inducing labor (such as eclampsia) and is not recommended for elective procedures or for making the birthing process more convenient.

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

Many medications that are used to treat infertility are injected subcutaneously. This is easy to do using the anterior abdomen as the site of injection but avoiding the area directly around the belly button.

For a complete list of videos, visit our video library