Which of the following is the first step in materials requirements planning (MRP)?
 
 

a. Setting deadlines for production and operations
  b. Specifying materials and parts needed for production and operations
  c. Determine inventory on hand
  d. Establish ordering and delivery schedules
  e. Rotate materials and parts to insure timely usage



Question 2

Materials Requirement Planning is valuable to managers because:
 
 

a. it is easily learned by all members of an organization.
  b. it can handle different lead times effectively.
  c. it does not require the use of a computer.
  d. All of these are reasons why MRP is valuable.
  e. None of these are reasons why MRP is valuable.




Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

fromAlphatoOmega22

  • Sr. Member
  • ****
  • Posts: 345
Answer to Question 1

B

Answer to Question 2

B




cmoore54

  • Member
  • Posts: 568
Reply 2 on: Jul 21, 2018
Excellent


adammoses97

  • Member
  • Posts: 337
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

The calories found in one piece of cherry cheesecake could light a 60-watt light bulb for 1.5 hours.

Did you know?

The Centers for Disease Control and Prevention (CDC) was originally known as the Communicable Disease Center, which was formed to fight malaria. It was originally headquartered in Atlanta, Georgia, since the Southern states faced the worst threat from malaria.

Did you know?

The tallest man ever known was Robert Wadlow, an American, who reached the height of 8 feet 11 inches. He died at age 26 years from an infection caused by the immense weight of his body (491 pounds) and the stress on his leg bones and muscles.

Did you know?

Vital signs (blood pressure, temperature, pulse rate, respiration rate) should be taken before any drug administration. Patients should be informed not to use tobacco or caffeine at least 30 minutes before their appointment.

Did you know?

Bisphosphonates were first developed in the nineteenth century. They were first investigated for use in disorders of bone metabolism in the 1960s. They are now used clinically for the treatment of osteoporosis, Paget's disease, bone metastasis, multiple myeloma, and other conditions that feature bone fragility.

For a complete list of videos, visit our video library