Author Question: With regards to constructing a service blueprint, the time required to perform one activity at one ... (Read 71 times)

CQXA

  • Hero Member
  • *****
  • Posts: 546
With regards to constructing a service blueprint, the time required to perform one activity at one station is called:
 A) process time.
  B) activity time.
  C) maximum output per hour.
  D) operation time.
  E) bottleneck time.

Question 2

Profit would be an example of a(n) __________.
 A) mission statement
  B) strategy
  C) goal or objective
  D) strength
  E) operating philosophy



nhea

  • Sr. Member
  • ****
  • Posts: 305
Answer to Question 1

B

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The first successful kidney transplant was performed in 1954 and occurred in Boston. A kidney from an identical twin was transplanted into his dying brother's body and was not rejected because it did not appear foreign to his body.

Did you know?

The cure for trichomoniasis is easy as long as the patient does not drink alcoholic beverages for 24 hours. Just a single dose of medication is needed to rid the body of the disease. However, without proper precautions, an individual may contract the disease repeatedly. In fact, most people develop trichomoniasis again within three months of their last treatment.

Did you know?

Drying your hands with a paper towel will reduce the bacterial count on your hands by 45–60%.

Did you know?

It is believed that the Incas used anesthesia. Evidence supports the theory that shamans chewed cocoa leaves and drilled holes into the heads of patients (letting evil spirits escape), spitting into the wounds they made. The mixture of cocaine, saliva, and resin numbed the site enough to allow hours of drilling.

Did you know?

Urine turns bright yellow if larger than normal amounts of certain substances are consumed; one of these substances is asparagus.

For a complete list of videos, visit our video library