Author Question: Which one of the following ladder output branch statements is NOT false? A) The software limits ... (Read 57 times)

SO00

  • Hero Member
  • *****
  • Posts: 568
Which one of the following ladder output branch statements is NOT false?
 
  A) The software limits the number placed in parallel.
  B) PLC 5 and SLC 500 can have branches at the output side of the rung.
  C) PLC 5 and SLC 500 output branches can include input instructions.
  D) ControlLogix processor requires that multiple outputs are in series and does not allow parallel single output per branches.

Question 2

The D qualifier letter ________.
 
  A) Will not execute if the timer for the action block is shorter than the step timer
  B) Uses an internal timer in the action block
  C) Is always used with an L action qualifier
  D) All the above



blakcmamba

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

D

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Throughout history, plants containing cardiac steroids have been used as heart drugs and as poisons (e.g., in arrows used in combat), emetics, and diuretics.

Did you know?

In the United States, an estimated 50 million unnecessary antibiotics are prescribed for viral respiratory infections.

Did you know?

Drugs are in development that may cure asthma and hay fever once and for all. They target leukotrienes, which are known to cause tightening of the air passages in the lungs and increase mucus productions in nasal passages.

Did you know?

In ancient Rome, many of the richer people in the population had lead-induced gout. The reason for this is unclear. Lead poisoning has also been linked to madness.

Did you know?

Medications that are definitely not safe to take when breastfeeding include radioactive drugs, antimetabolites, some cancer (chemotherapy) agents, bromocriptine, ergotamine, methotrexate, and cyclosporine.

For a complete list of videos, visit our video library