Direct manufacturing labor and direct materials variances, missing data.
 
  (CMA, heavily adapted) Young Bay Surfboards manufactures fiberglass surfboards. The standard cost of direct materials and direct manufacturing labor is 223 per board. This includes 40 pounds of direct materials, at the budgeted price of 2 per pound, and 10 hours of direct manufacturing labor, at the budgeted rate of 14.30 per hour. Following are additional data for the month of July:
 
  There were no beginning inventories.
 
  Required:
  1. Compute direct manufacturing labor variances for July.
  2. Compute the actual pounds of direct materials used in production in July.
  3. Calculate the actual price per pound of direct materials purchased.
  4. Calculate the direct materials price variance.

Question 2

Failure to record the adjusting entry for depreciation will overstate assets on the balance sheet.
  Indicate whether the statement is true or false



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Athena23

  • Sr. Member
  • ****
  • Posts: 305
Answer to Question 1

1.
Flexible Budget
(Budgeted Input
Actual Costs Qty. Allowed for
Incurred (Actual Actual Input Qty. Actual Output
Input Qty. Actual Price)  Budgeted Price  Budgeted Price)
Direct mfg. labor 594,500a 586,300b 786,500c

8,200 U 200,200 F
Price variance Efficiency variance

192,000 F
Flexible-budget variance

a Given (or 41,000 hours  14.50/hour)
b 41,000 hours  14.30/hour = 735,000
c 5,500 units  10 hours/unit  14.30/hour = 786,500

2. The favorable direct materials efficiency variance of 1,700 indicates that fewer pounds of direct materials were actually used than the budgeted quantity allowed for actual output.

=

= 850 pounds

Budgeted pounds allowed for the output achieved = 5,500  40 = 220,000 pounds

Actual pounds of direct materials used = 220,000  850 = 219,150 pounds

3. Actual price paid per pound = 432,000/160,000
= 2.70 per pound

4. Actual Costs Incurred Actual Input
(Actual Input  Actual Price) Budgeted Price
432,000a 320,000b

112,000 U
Price variance

a Given
b 160,000 pounds  2/pound = 320,000

Answer to Question 2

T




go.lag

  • Member
  • Posts: 667
Reply 2 on: Jul 6, 2018
Wow, this really help


Hdosisshsbshs

  • Member
  • Posts: 315
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Vital signs (blood pressure, temperature, pulse rate, respiration rate) should be taken before any drug administration. Patients should be informed not to use tobacco or caffeine at least 30 minutes before their appointment.

Did you know?

According to the Migraine Research Foundation, migraines are the third most prevalent illness in the world. Women are most affected (18%), followed by children of both sexes (10%), and men (6%).

Did you know?

According to animal studies, the typical American diet is damaging to the liver and may result in allergies, low energy, digestive problems, and a lack of ability to detoxify harmful substances.

Did you know?

Allergies play a major part in the health of children. The most prevalent childhood allergies are milk, egg, soy, wheat, peanuts, tree nuts, and seafood.

Did you know?

The calories found in one piece of cherry cheesecake could light a 60-watt light bulb for 1.5 hours.

For a complete list of videos, visit our video library