Activity-based costing, job-costing system.
 
  The job costing system at Sheri's Custom Framing has five indirect cost pools (purchasing, material handling, machine maintenance, product inspection, and packaging). The company is in the process of bidding on two jobs: Job 215, an order of 15 intricate personalized frames, and Job 325, an order of 6 standard personalized frames. The controller wants you to compare overhead allocated under the current simple job-costing system and a newly designed activity-based job-costing system. Total budgeted costs in each indirect cost pool and the budgeted quantity of activity driver are as follows.
 
  Information related to Job 215 and Job 325 follows. Job 215 incurs more batch-level costs because it uses more types of materials that need to be purchased, moved, and inspected relative to Job 325.
 
  Required:
  1. Compute the total overhead allocated to each job under a simple costing system, where overhead is allocated based on machine-hours.
  2. Compute the total overhead allocated to each job under an activity-based costing system using the appropriate activity drivers.
  3. Explain why Sheri's Custom Framing might favor the ABC job-costing system over the simple job-costing system, especially in its bidding process.

Question 2

Newton Company bought equipment, paying cash, 25,000 . Which of the following is true in regards to the fundamental accounting equation?
 a. Total assets increased by 25,000.
  b. Total liabilities increased by 25,000.
  c. Total liabilities decreased by 25,000.
  d. Total Owner's Equity increased by 25,000.
  e. Total assets are unaffected.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

blfontai

  • Sr. Member
  • ****
  • Posts: 327
Answer to Question 1

1. Overhead allocation using a simple job-costing system, where overhead is allocated based on machine hours:

Overhead allocation rate = 226,800  10,500 machine-hours = 21.60 per machine-hour

Job 215 Job 325

Overhead allocateda  864 1,296
a 21.60 per machine-hour  40 hours; 60 hours

2. Overhead allocation using an activity-based job-costing system:

Budgeted Overhead
(1) Activity Driver
(2) Budgeted Activity Driver
(3) Activity Rate
(4) = (1)  (3)
Purchasing  35,000 Purchase orders processed 2,000 17.50
Material handling  43,750 Material moves 5,000  8.75
Machine maintenance  118,650 Machine hours 10,500 11.30
Product inspection  9,450 Inspections 1,200 7.875
Packaging  19,950 Units produced 3,800  5.25
 226,800

Job 215 Job 325
Overhead allocated
Purchasing (17.50  25; 8 orders)  437.50 140.00
Material handling (8.75  10; 4 moves) 87.50 35.00
Machine maintenance (11.30  40; 60 hours) 452.00 678.00
Product inspection (7.875  9; 3 inspections) 70.88 23.63
Packaging (5.25  15; 6 units) 78.75 31.50
Total 1,126.63 908.13

3. The manufacturing manager likely would find the ABC job-costing system more useful in cost management. Unlike direct manufacturing labor costs, the five indirect cost pools are systematically linked to the activity areas at the plant. The result is more accurate product costing. The manufacturing manager can seek to reduce both the level of activity (fewer purchase orders, less material handling) and the cost of each activity (such as the cost per inspection).
Marketing managers can use ABC information to bid for jobs more competitively because ABC provides managers with a more accurate reflection of the resources used for and the costs of each job.

Answer to Question 2

E




mcmcdaniel

  • Member
  • Posts: 550
Reply 2 on: Jul 6, 2018
Thanks for the timely response, appreciate it


jomama

  • Member
  • Posts: 346
Reply 3 on: Yesterday
Excellent

 

Did you know?

To combat osteoporosis, changes in lifestyle and diet are recommended. At-risk patients should include 1,200 to 1,500 mg of calcium daily either via dietary means or with supplements.

Did you know?

The effects of organophosphate poisoning are referred to by using the abbreviations “SLUD” or “SLUDGE,” It stands for: salivation, lacrimation, urination, defecation, GI upset, and emesis.

Did you know?

Congestive heart failure is a serious disorder that carries a reduced life expectancy. Heart failure is usually a chronic illness, and it may worsen with infection or other physical stressors.

Did you know?

The human body produces and destroys 15 million blood cells every second.

Did you know?

Hip fractures are the most serious consequences of osteoporosis. The incidence of hip fractures increases with each decade among patients in their 60s to patients in their 90s for both women and men of all populations. Men and women older than 80 years of age show the highest incidence of hip fractures.

For a complete list of videos, visit our video library