Activity-based costing, job-costing system.
 
  The job costing system at Sheri's Custom Framing has five indirect cost pools (purchasing, material handling, machine maintenance, product inspection, and packaging). The company is in the process of bidding on two jobs: Job 215, an order of 15 intricate personalized frames, and Job 325, an order of 6 standard personalized frames. The controller wants you to compare overhead allocated under the current simple job-costing system and a newly designed activity-based job-costing system. Total budgeted costs in each indirect cost pool and the budgeted quantity of activity driver are as follows.
 
  Information related to Job 215 and Job 325 follows. Job 215 incurs more batch-level costs because it uses more types of materials that need to be purchased, moved, and inspected relative to Job 325.
 
  Required:
  1. Compute the total overhead allocated to each job under a simple costing system, where overhead is allocated based on machine-hours.
  2. Compute the total overhead allocated to each job under an activity-based costing system using the appropriate activity drivers.
  3. Explain why Sheri's Custom Framing might favor the ABC job-costing system over the simple job-costing system, especially in its bidding process.

Question 2

Newton Company bought equipment, paying cash, 25,000 . Which of the following is true in regards to the fundamental accounting equation?
 a. Total assets increased by 25,000.
  b. Total liabilities increased by 25,000.
  c. Total liabilities decreased by 25,000.
  d. Total Owner's Equity increased by 25,000.
  e. Total assets are unaffected.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

blfontai

  • Sr. Member
  • ****
  • Posts: 327
Answer to Question 1

1. Overhead allocation using a simple job-costing system, where overhead is allocated based on machine hours:

Overhead allocation rate = 226,800  10,500 machine-hours = 21.60 per machine-hour

Job 215 Job 325

Overhead allocateda  864 1,296
a 21.60 per machine-hour  40 hours; 60 hours

2. Overhead allocation using an activity-based job-costing system:

Budgeted Overhead
(1) Activity Driver
(2) Budgeted Activity Driver
(3) Activity Rate
(4) = (1)  (3)
Purchasing  35,000 Purchase orders processed 2,000 17.50
Material handling  43,750 Material moves 5,000  8.75
Machine maintenance  118,650 Machine hours 10,500 11.30
Product inspection  9,450 Inspections 1,200 7.875
Packaging  19,950 Units produced 3,800  5.25
 226,800

Job 215 Job 325
Overhead allocated
Purchasing (17.50  25; 8 orders)  437.50 140.00
Material handling (8.75  10; 4 moves) 87.50 35.00
Machine maintenance (11.30  40; 60 hours) 452.00 678.00
Product inspection (7.875  9; 3 inspections) 70.88 23.63
Packaging (5.25  15; 6 units) 78.75 31.50
Total 1,126.63 908.13

3. The manufacturing manager likely would find the ABC job-costing system more useful in cost management. Unlike direct manufacturing labor costs, the five indirect cost pools are systematically linked to the activity areas at the plant. The result is more accurate product costing. The manufacturing manager can seek to reduce both the level of activity (fewer purchase orders, less material handling) and the cost of each activity (such as the cost per inspection).
Marketing managers can use ABC information to bid for jobs more competitively because ABC provides managers with a more accurate reflection of the resources used for and the costs of each job.

Answer to Question 2

E




mcmcdaniel

  • Member
  • Posts: 550
Reply 2 on: Jul 6, 2018
Excellent


JaynaD87

  • Member
  • Posts: 368
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

Congestive heart failure is a serious disorder that carries a reduced life expectancy. Heart failure is usually a chronic illness, and it may worsen with infection or other physical stressors.

Did you know?

In 1886, William Bates reported on the discovery of a substance produced by the adrenal gland that turned out to be epinephrine (adrenaline). In 1904, this drug was first artificially synthesized by Friedrich Stolz.

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

The average human gut is home to perhaps 500 to 1,000 different species of bacteria.

Did you know?

Stevens-Johnson syndrome and Toxic Epidermal Necrolysis syndrome are life-threatening reactions that can result in death. Complications include permanent blindness, dry-eye syndrome, lung damage, photophobia, asthma, chronic obstructive pulmonary disease, permanent loss of nail beds, scarring of mucous membranes, arthritis, and chronic fatigue syndrome. Many patients' pores scar shut, causing them to retain heat.

For a complete list of videos, visit our video library