Question List for "Operations Management"

  Topics Views Last post
Management » Use Table I.1 for the following question. What is the acceptance number of a single-sampling plan if ... New
Started by formula1
69 Apr 18, 2020
Management » ________ is the risk that a lot with LTPD will be accepted a type II error. New
Started by mpobi80
82 Apr 18, 2020
Management » ________ is the quality level desired by the consumer. New
Started by Mr. Wonderful
69 Apr 18, 2020
Management » A single-sampling plan has the following performance: What is the average outgoing quality limit if ... New
Started by pragya sharda
65 Apr 18, 2020
Management » A sample of 100 items is randomly selected from a shipment of incoming materials. AQL and LTPD have ... New
Started by tatyanajohnson
34 Apr 18, 2020
Management » A manufacturer wants a sampling plan in which AQL = 0.02, LPTD = 0.12, = 0.05, and = 0.10. Which ... New
Started by washai
59 Apr 18, 2020
Management » ________ is the risk that the sampling plan will fail to verify an acceptable lot's quality and thus ... New
Started by biggirl4568
59 Apr 18, 2020
Management » A single-sampling plan using a sample size of 50 has the following performance: If the plan is used ... New
Started by tiara099
100 Apr 18, 2020
Management » A lot of 2,000 items has just arrived. A single sampling calls for a sample size of 100 and c = 3. ... New
Started by erika
47 Apr 18, 2020
Management » A company is developing an acceptance sampling plan to monitor quality. The acceptable quality level ... New
Started by Kthamas
96 Apr 18, 2020