Author Question: Technician A says that a pressure check valve should hold system pressure for at least five minutes ... (Read 145 times)

Jkov05

  • Hero Member
  • *****
  • Posts: 556
Technician A says that a pressure check valve should hold system pressure for at least five minutes after the pump is shut off. Technician B says that a defective check valve could cause long cranking time. Which technician is correct?
 
  A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Question 2

Technician A says that the fuel pump relay is usually controlled by the PCM. Technician B says that a TBI injector squirts fuel above the throttle plate. Which technician is correct?
 
  A) Technician A only B) Technician B only C) Both technicians D) Neither technician



Silverbeard98

  • Sr. Member
  • ****
  • Posts: 355
Answer to Question 1

C

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

Did you know?

Patients who cannot swallow may receive nutrition via a parenteral route—usually, a catheter is inserted through the chest into a large vein going into the heart.

Did you know?

Most women experience menopause in their 50s. However, in 1994, an Italian woman gave birth to a baby boy when she was 61 years old.

Did you know?

Barbituric acid, the base material of barbiturates, was first synthesized in 1863 by Adolph von Bayer. His company later went on to synthesize aspirin for the first time, and Bayer aspirin is still a popular brand today.

Did you know?

Cytomegalovirus affects nearly the same amount of newborns every year as Down syndrome.

For a complete list of videos, visit our video library