For any waiting line system, (Average number of units in waiting line) = (Total waiting time) divided by (Total time of simulation).
Indicate whether the statement is true or false
Question 2
If two bar charts made from the rows of a cross-classification table look the same, then the two nominal variables ___________________ _ (are/are not) related.
Fill in the blank(s) with correct word