Author Question: A small firm builds galvanized swing sets. The investment in plant and equipment is 200,000 . The ... (Read 118 times)

PhilipSeeMore

  • Hero Member
  • *****
  • Posts: 561
A small firm builds galvanized swing sets. The investment in plant and equipment is 200,000 . The variable cost per swing set is 500 . The selling price of the swing set is 1000 . How many swing sets would have to be sold for the firm to break even?

Question 2

The degrees of freedom for a contingency table with 10 rows and 11 columns is
 a. 100
  b. 110
  c. 21
  d. 90



huda

  • Sr. Member
  • ****
  • Posts: 304
Answer to Question 1

400 swing sets

Answer to Question 2

D



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Never take aspirin without food because it is likely to irritate your stomach. Never give aspirin to children under age 12. Overdoses of aspirin have the potential to cause deafness.

Did you know?

If you could remove all of your skin, it would weigh up to 5 pounds.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

Lower drug doses for elderly patients should be used first, with titrations of the dose as tolerated to prevent unwanted drug-related pharmacodynamic effects.

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

For a complete list of videos, visit our video library