This topic contains a solution. Click here to go to the answer

Author Question: The materials requirement plan (MRP) is a long-range materials plan that converts information ... (Read 736 times)

justinmsk

  • Hero Member
  • *****
  • Posts: 524
The materials requirement plan (MRP) is a long-range materials plan that converts information regarding end-items in the MPS into a set of time-phased component and part requirements.
 
 Indicate whether the statement is true or false

Question 2

What phrase refers to the fact that conflict can be squashed if one player is inherently more powerful than another?
 a. right makes fight
  b. fight makes right
  c. right makes might
  d. might makes right



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

mjenn52

  • Sr. Member
  • ****
  • Posts: 351
Answer to Question 1

False

Answer to Question 2

d




justinmsk

  • Member
  • Posts: 524
Reply 2 on: Jun 28, 2018
Great answer, keep it coming :)


Sarahjh

  • Member
  • Posts: 370
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

There can actually be a 25-hour time difference between certain locations in the world. The International Date Line passes between the islands of Samoa and American Samoa. It is not a straight line, but "zig-zags" around various island chains. Therefore, Samoa and nearby islands have one date, while American Samoa and nearby islands are one day behind. Daylight saving time is used in some islands, but not in others—further shifting the hours out of sync with natural time.

Did you know?

A headache when you wake up in the morning is indicative of sinusitis. Other symptoms of sinusitis can include fever, weakness, tiredness, a cough that may be more severe at night, and a runny nose or nasal congestion.

Did you know?

The lipid bilayer is made of phospholipids. They are arranged in a double layer because one of their ends is attracted to water while the other is repelled by water.

Did you know?

Certain chemicals, after ingestion, can be converted by the body into cyanide. Most of these chemicals have been removed from the market, but some old nail polish remover, solvents, and plastics manufacturing solutions can contain these substances.

Did you know?

Malaria was not eliminated in the United States until 1951. The term eliminated means that no new cases arise in a country for 3 years.

For a complete list of videos, visit our video library