Author Question: The longer the time horizon of a project, the more important choosing the right discount rate is. ... (Read 41 times)

luminitza

  • Hero Member
  • *****
  • Posts: 555
The longer the time horizon of a project, the more important choosing the right discount rate is.
 
  a. True b. False

Question 2

________ maximization is achieved when a company manages its business in such a way that its cash flows over time, discounted at the appropriate discount rate, will cause the value of the company's common stock to be at a maximum.
 
  A) Profit
  B) Stockholder wealth
  C) Asset
  D) None of the above



rnehls

  • Sr. Member
  • ****
  • Posts: 313
Answer to Question 1

a

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Automated pill dispensing systems have alarms to alert patients when the correct dosing time has arrived. Most systems work with many varieties of medications, so patients who are taking a variety of drugs can still be in control of their dose regimen.

Did you know?

Increased intake of vitamin D has been shown to reduce fractures up to 25% in older people.

Did you know?

The B-complex vitamins and vitamin C are not stored in the body and must be replaced each day.

Did you know?

Drying your hands with a paper towel will reduce the bacterial count on your hands by 45–60%.

Did you know?

Vital signs (blood pressure, temperature, pulse rate, respiration rate) should be taken before any drug administration. Patients should be informed not to use tobacco or caffeine at least 30 minutes before their appointment.

For a complete list of videos, visit our video library