This topic contains a solution. Click here to go to the answer

Author Question: A ________ is bar graph with time on the horizontal axis and activities to be scheduled on the ... (Read 49 times)

haleyc112

  • Hero Member
  • *****
  • Posts: 600
A ________ is bar graph with time on the horizontal axis and activities to be scheduled on the vertical axis.
 
  A) graphic analysis
  B) flow chart
  C) PERT diagram
  D) quality control checkpoint
  E) Gantt chart

Question 2

________ refers to a system in Germany which requires a company's supervising board to have employee representatives, giving unions and employees a say in policy and a stake in company's success.
 
  a. Severability
  b. Codetermination
  c. Preemption
  d. Arbitrability



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

yotaSR5

  • Sr. Member
  • ****
  • Posts: 331
Answer to Question 1

E

Answer to Question 2

b




haleyc112

  • Member
  • Posts: 600
Reply 2 on: Jul 7, 2018
Gracias!


pratush dev

  • Member
  • Posts: 321
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

There are 20 feet of blood vessels in each square inch of human skin.

Did you know?

Approximately 70% of expectant mothers report experiencing some symptoms of morning sickness during the first trimester of pregnancy.

Did you know?

Normal urine is sterile. It contains fluids, salts, and waste products. It is free of bacteria, viruses, and fungi.

Did you know?

Aspirin is the most widely used drug in the world. It has even been recognized as such by the Guinness Book of World Records.

For a complete list of videos, visit our video library