Author Question: The second phase in the SDLC is ________. A) Planning B) Analysis C) Design D) ... (Read 50 times)

xroflmao

  • Hero Member
  • *****
  • Posts: 515
The second phase in the SDLC is ________.
 
  A) Planning
  B) Analysis
  C) Design
  D) Implementation

Question 2

________ is the process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks.
 
  A) Work breakdown structure
  B) Task breakdown structure
  C) Project breakdown structure
  D) Management breakdown structure


ryhom

  • Sr. Member
  • ****
  • Posts: 366
Answer to Question 1

B

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Your heart beats over 36 million times a year.

Did you know?

The Food and Drug Administration has approved Risperdal, an adult antipsychotic drug, for the symptomatic treatment of irritability in children and adolescents with autism. The approval is the first for the use of a drug to treat behaviors associated with autism in children. These behaviors are included under the general heading of irritability and include aggression, deliberate self-injury, and temper tantrums.

Did you know?

Complications of influenza include: bacterial pneumonia, ear and sinus infections, dehydration, and worsening of chronic conditions such as asthma, congestive heart failure, or diabetes.

Did you know?

Amphetamine poisoning can cause intravascular coagulation, circulatory collapse, rhabdomyolysis, ischemic colitis, acute psychosis, hyperthermia, respiratory distress syndrome, and pericarditis.

Did you know?

The strongest synthetic topical retinoid drug available, tazarotene, is used to treat sun-damaged skin, acne, and psoriasis.

For a complete list of videos, visit our video library