This topic contains a solution. Click here to go to the answer

Author Question: Typically in a BI system, analysis begins with a massive volume of data being scaled down to a small ... (Read 145 times)

penza

  • Hero Member
  • *****
  • Posts: 1,022
Typically in a BI system, analysis begins with a massive volume of data being scaled down to a small set if the analysis looks promising.
 
  Indicate whether the statement is true or false

Question 2

How can process management principles improve processes?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

cloudre37

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

FALSE

Answer to Question 2

A business can improve a process by adding resources to a given process without changing its structure. Some processes can also be improved by removing unproductive resources. Another way of altering a business process is to change its structure. Process designers can change the arrangement of the activities of a process.




penza

  • Member
  • Posts: 1,022
Reply 2 on: Jul 7, 2018
Thanks for the timely response, appreciate it


carojassy25

  • Member
  • Posts: 299
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

Complications of influenza include: bacterial pneumonia, ear and sinus infections, dehydration, and worsening of chronic conditions such as asthma, congestive heart failure, or diabetes.

Did you know?

In 1886, William Bates reported on the discovery of a substance produced by the adrenal gland that turned out to be epinephrine (adrenaline). In 1904, this drug was first artificially synthesized by Friedrich Stolz.

Did you know?

Carbamazepine can interfere with the results of home pregnancy tests. If you are taking carbamazepine, do not try to test for pregnancy at home.

Did you know?

HIV testing reach is still limited. An estimated 40% of people with HIV (more than 14 million) remain undiagnosed and do not know their infection status.

Did you know?

There used to be a metric calendar, as well as metric clocks. The metric calendar, or "French Republican Calendar" divided the year into 12 months, but each month was divided into three 10-day weeks. Each day had 10 decimal hours. Each hour had 100 decimal minutes. Due to lack of popularity, the metric clocks and calendars were ended in 1795, three years after they had been first marketed.

For a complete list of videos, visit our video library