Author Question: When the ERP vendor evaluation process gets down to the final two vendors, it is good to create a ... (Read 31 times)

anshika

  • Hero Member
  • *****
  • Posts: 510
When the ERP vendor evaluation process gets down to the final two vendors, it is good to create a ________ between the two vendors.
 
  A) synergy
  B) competition
  C) RFB
  D) TCO
  E) none of the above

Question 2

The BPR methodology continues to the fourth step ________.
 
  A) testing
  B) mapping
  C) definition
  D) reevaluation
  E) preparation



katkat_flores

  • Sr. Member
  • ****
  • Posts: 328
Answer to Question 1

B

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The most dangerous mercury compound, dimethyl mercury, is so toxic that even a few microliters spilled on the skin can cause death. Mercury has been shown to accumulate in higher amounts in the following types of fish than other types: swordfish, shark, mackerel, tilefish, crab, and tuna.

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

Fewer than 10% of babies are born on their exact due dates, 50% are born within 1 week of the due date, and 90% are born within 2 weeks of the date.

Did you know?

No drugs are available to relieve parathyroid disease. Parathyroid disease is caused by a parathyroid tumor, and it needs to be removed by surgery.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

For a complete list of videos, visit our video library