This topic contains a solution. Click here to go to the answer

Author Question: Usually you need ________ to clarify class relationships from different, but overlapping viewpoints. ... (Read 71 times)

Awilson837

  • Hero Member
  • *****
  • Posts: 509
Usually you need ________ to clarify class relationships from different, but overlapping viewpoints.
 
  A) multiple class diagrams
  B) a single class diagram
  C) overlapping class diagrams
  D) abstract classes

Question 2

Briefly describe the Capability Maturity Model(CMM).
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

jomama

  • Sr. Member
  • ****
  • Posts: 346
Answer to Question 1

A

Answer to Question 2

The Capability Maturity Model was developed by the Software Engineering Institute (SEI) at Carnegie Mellon University in response to the concerns of U.S. Department of Defense (DOD), specifically the United States Air Force, about the capabilities of software contractors. CMM is essentially a rating and auditing framework of standards. In this framework, an organization fits one of the five maturity levels and each level has a focus:
Initial (or ad hoc). Focus: Individual Effort. At this level, the organization lacks a stable environment for developing products. The successes and failures depend on the capabilities of the people, not processes.
Repeatable. Focus: Project Management. At this level, processes are repeatable and the organization has adopted basic project management principles and practices to control costs and manage schedules.
Defined. Focus: Engineering Process. Processes are defined as standard procedures, tools, techniques, and so on. Through training programs, the standards are established across the organization to ensure that managers and staff alike have the required knowledge and training to fulfill the standards.
Managed. Focus: Product and Process Quality. By establishing precise measurement criteria, management has effective control of the development process, can improve the processes, and can tailor them to fit new technologies or specific projects.
Optimizing. Focus: Continuous Process Improvement. The organization as a whole is focused on continually improving the processes through both incremental and radical improvements.





 

Did you know?

Every 10 seconds, a person in the United States goes to the emergency room complaining of head pain. About 1.2 million visits are for acute migraine attacks.

Did you know?

Glaucoma is a leading cause of blindness. As of yet, there is no cure. Everyone is at risk, and there may be no warning signs. It is six to eight times more common in African Americans than in whites. The best and most effective way to detect glaucoma is to receive a dilated eye examination.

Did you know?

Only one in 10 cancer deaths is caused by the primary tumor. The vast majority of cancer mortality is caused by cells breaking away from the main tumor and metastasizing to other parts of the body, such as the brain, bones, or liver.

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

There are approximately 3 million unintended pregnancies in the United States each year.

For a complete list of videos, visit our video library