Author Question: The critical path determines the longest time required to complete the project. Indicate whether ... (Read 87 times)

Alygatorr01285

  • Hero Member
  • *****
  • Posts: 564
The critical path determines the longest time required to complete the project.
 
  Indicate whether the statement is true or false

Question 2

The _________ is an optional bit string field used to identify uniquely the issuing CA in the event the X.500 name has been reused for different entities.
 
  What will be an ideal response?



janieazgirl

  • Sr. Member
  • ****
  • Posts: 300
Answer to Question 1

FALSE

Answer to Question 2

issuer unique identifier



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Most fungi that pathogenically affect humans live in soil. If a person is not healthy, has an open wound, or is immunocompromised, a fungal infection can be very aggressive.

Did you know?

On average, someone in the United States has a stroke about every 40 seconds. This is about 795,000 people per year.

Did you know?

Inotropic therapy does not have a role in the treatment of most heart failure patients. These drugs can make patients feel and function better but usually do not lengthen the predicted length of their lives.

Did you know?

Russia has the highest death rate from cardiovascular disease followed by the Ukraine, Romania, Hungary, and Poland.

Did you know?

To maintain good kidney function, you should drink at least 3 quarts of water daily. Water dilutes urine and helps prevent concentrations of salts and minerals that can lead to kidney stone formation. Chronic dehydration is a major contributor to the development of kidney stones.

For a complete list of videos, visit our video library