Author Question: The nurse manager determines that four registered nurses are needed to adequately provide care for ... (Read 54 times)

roselinechinyere27m

  • Hero Member
  • *****
  • Posts: 557
The nurse manager determines that four registered nurses are needed to adequately provide care for 16 clients on the unit during the night shift.
 
  Which of the following statements indicate that the nurse manager is utilizing descriptive methodology to determine staffing needs?
  1. I use client data like the average unit census and the average length of stay. I plug these data into a formula and that's how I determine staffing.
  2. I include information that we learned about how long it takes to perform certain nursing tasks to determine staffing needs.
  3. After I take a look at the client acuity levels on the unit, I usually rely on my gut instinct'.
  4. We use information that comes from the nurse supervisors to determine staffing needs based on how we care for clients on our unit.

Question 2

Determine the nursing staff productivity index. The unit standard is 8 nursing hours per patient day (NHPPD). There are 22 patients. 9 RNs are staffed for 24 hours. Patient days = 10 days. Round your answer to a whole percentage point.
 
  What will be an ideal response?



abro1885

  • Sr. Member
  • ****
  • Posts: 337
Answer to Question 1

Answer: 3

Rationale: Descriptive methodology refers to developing a staffing pattern based on subjective data. The nurse manager uses his or her experience and intuition to guide staffing activities. The industrial engineering approach is used when the nurse manager develops a staffing pattern based on specific objective data. This typically includes the following: work distribution, task analysis, work sampling, and time-and-motion studies. The management engineering methodology refers to developing a staffing pattern based on a staffing index model. Client acuity information, unit-specific information, and operating budget are used to find the most appropriate staffing pattern.

Answer to Question 2

Answer: 81

Rationale:
22 patients x 10 days each = 220 patient days
220 patient days x 8 NHPPD = 1760 work hours = output
9 RNs for 24 hours for 10 days each = 2160 hours worked = input

Output / input x 100 = nursing staff productivity index ()
1760 / 2160 x 100 = 81.48 = 81



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Illness; diuretics; laxative abuse; hot weather; exercise; sweating; caffeine; alcoholic beverages; starvation diets; inadequate carbohydrate consumption; and diets high in protein, salt, or fiber can cause people to become dehydrated.

Did you know?

The largest baby ever born weighed more than 23 pounds but died just 11 hours after his birth in 1879. The largest surviving baby was born in October 2009 in Sumatra, Indonesia, and weighed an astounding 19.2 pounds at birth.

Did you know?

More than 20 million Americans cite use of marijuana within the past 30 days, according to the National Survey on Drug Use and Health (NSDUH). More than 8 million admit to using it almost every day.

Did you know?

About one in five American adults and teenagers have had a genital herpes infection—and most of them don't know it. People with genital herpes have at least twice the risk of becoming infected with HIV if exposed to it than those people who do not have genital herpes.

Did you know?

Atropine was named after the Greek goddess Atropos, the oldest and ugliest of the three sisters known as the Fates, who controlled the destiny of men.

For a complete list of videos, visit our video library