Author Question: The SW-PBIS team is responsible for many duties. The team is most productive when they have which of ... (Read 18 times)

vHAUNG6011

  • Hero Member
  • *****
  • Posts: 514
The SW-PBIS team is responsible for many duties. The team is most productive when they have which of the following elements?
 
  a. Structured meetings, including an agenda for each meeting.
  b. Meeting times that are flexible, meeting only as needed.
  c. Loosely defined roles for each team member.
  d. all of the above

Question 2

Educators can measure severity of disruptive behavior using
 
  A. observations.
  B. rubrics.
  C. Antecedent-Behavior-Consequence (ABC) analysis.
  D. structured interviews.



smrerig

  • Sr. Member
  • ****
  • Posts: 325
Answer to Question 1

a

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

Calcitonin is a naturally occurring hormone. In women who are at least 5 years beyond menopause, it slows bone loss and increases spinal bone density.

Did you know?

Only one in 10 cancer deaths is caused by the primary tumor. The vast majority of cancer mortality is caused by cells breaking away from the main tumor and metastasizing to other parts of the body, such as the brain, bones, or liver.

Did you know?

Increased intake of vitamin D has been shown to reduce fractures up to 25% in older people.

Did you know?

The effects of organophosphate poisoning are referred to by using the abbreviations “SLUD” or “SLUDGE,” It stands for: salivation, lacrimation, urination, defecation, GI upset, and emesis.

For a complete list of videos, visit our video library