Author Question: A flexible budget: A) is based on a single assumed level of sales. B) differentiates the budgeted ... (Read 169 times)

yoroshambo

  • Hero Member
  • *****
  • Posts: 566
A flexible budget:
 A) is based on a single assumed level of sales.
  B) differentiates the budgeted costs for each sales level.
  C) is the budget that is prepared before a static budget.
  D) cannot be used for evaluating real-world sales situations.

Question 2

A partnership formed to operate for a specific time period or to accomplish a specific purpose is known as a
 A) conglomerate.
  B) cooperative.
  C) joint venture.
  D) corporation.
  E) joint merger.



jasonq

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

B

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

The first documented use of surgical anesthesia in the United States was in Connecticut in 1844.

Did you know?

Today, nearly 8 out of 10 pregnant women living with HIV (about 1.1 million), receive antiretrovirals.

Did you know?

In 1835 it was discovered that a disease of silkworms known as muscardine could be transferred from one silkworm to another, and was caused by a fungus.

Did you know?

Pope Sylvester II tried to introduce Arabic numbers into Europe between the years 999 and 1003, but their use did not catch on for a few more centuries, and Roman numerals continued to be the primary number system.

For a complete list of videos, visit our video library