Author Question: After assessing the risks of a project, the second step is to ________ each risk, or to think about ... (Read 51 times)

Lisaclaire

  • Hero Member
  • *****
  • Posts: 569
After assessing the risks of a project, the second step is to ________ each risk, or to think about whether the adverse impact will be major or minor.
 Fill in the blank(s) with correct word

Question 2

Which president stated that consumers have the right to service?
 A) Franklin D. Roosevelt
  B) John F. Kennedy
  C) Lyndon B. Johnson
  D) Gerald R. Ford
  E) Bill Clinton



hanadaa

  • Sr. Member
  • ****
  • Posts: 339
Answer to Question 1

prioritize

Answer to Question 2

E



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

When Gabriel Fahrenheit invented the first mercury thermometer, he called "zero degrees" the lowest temperature he was able to attain with a mixture of ice and salt. For the upper point of his scale, he used 96°, which he measured as normal human body temperature (we know it to be 98.6° today because of more accurate thermometers).

Did you know?

A seasonal flu vaccine is the best way to reduce the chances you will get seasonal influenza and spread it to others.

Did you know?

Nearly 31 million adults in America have a total cholesterol level that is more than 240 mg per dL.

Did you know?

The oldest recorded age was 122. Madame Jeanne Calment was born in France in 1875 and died in 1997. She was a vegetarian and loved olive oil, port wine, and chocolate.

Did you know?

Green tea is able to stop the scent of garlic or onion from causing bad breath.

For a complete list of videos, visit our video library