Author Question: Which specifications are used for parts of the project that are difficult to verify for correctness ... (Read 58 times)

mckennatimberlake

  • Hero Member
  • *****
  • Posts: 559
Which specifications are used for parts of the project that are difficult to verify for correctness after construction has been completed?
 
  a. technical c. performance
  b. design d. master format

Question 2

How can the grading practice be designed to minimize the need for hauling away the soil?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

hramirez205

  • Sr. Member
  • ****
  • Posts: 345
Answer to Question 1

A
technical

Answer to Question 2

By using the cut to create fill whenever possible




mckennatimberlake

  • Member
  • Posts: 559
Reply 2 on: Jul 21, 2018
Thanks for the timely response, appreciate it


nyrave

  • Member
  • Posts: 344
Reply 3 on: Yesterday
Excellent

 

Did you know?

In most cases, kidneys can recover from almost complete loss of function, such as in acute kidney (renal) failure.

Did you know?

Multiple sclerosis is a condition wherein the body's nervous system is weakened by an autoimmune reaction that attacks the myelin sheaths of neurons.

Did you know?

Human stomach acid is strong enough to dissolve small pieces of metal such as razor blades or staples.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

Chronic marijuana use can damage the white blood cells and reduce the immune system's ability to respond to disease by as much as 40%. Without a strong immune system, the body is vulnerable to all kinds of degenerative and infectious diseases.

For a complete list of videos, visit our video library