Author Question: The first step in troubleshooting a system is: A) Replacing defective components. B) Recognizing ... (Read 25 times)

oliviahorn72

  • Hero Member
  • *****
  • Posts: 579
The first step in troubleshooting a system is:
 
  A) Replacing defective components.
  B) Recognizing what component is operating incorrectly.
  C) Understanding the system operational sequence.
  D) Testing to isolate the cause.

Question 2

An expansion tank problem may be indicated by:
 
  A) A weeping relief valve. B) A defective mixing valve.
  C) A clogged air separator. D) A low pressure problem.



ririgirl15

  • Sr. Member
  • ****
  • Posts: 385
Answer to Question 1

C

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

The top 10 most important tips that will help you grow old gracefully include (1) quit smoking, (2) keep your weight down, (3) take supplements, (4) skip a meal each day or fast 1 day per week, (5) get a pet, (6) get medical help for chronic pain, (7) walk regularly, (8) reduce arguments, (9) put live plants in your living space, and (10) do some weight training.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

It is difficult to obtain enough calcium without consuming milk or other dairy foods.

Did you know?

Less than one of every three adults with high LDL cholesterol has the condition under control. Only 48.1% with the condition are being treated for it.

Did you know?

There are major differences in the metabolism of morphine and the illegal drug heroin. Morphine mostly produces its CNS effects through m-receptors, and at k- and d-receptors. Heroin has a slight affinity for opiate receptors. Most of its actions are due to metabolism to active metabolites (6-acetylmorphine, morphine, and morphine-6-glucuronide).

For a complete list of videos, visit our video library