Author Question: Explain why construction contracts should include a destruction of subject matter clause. What ... (Read 21 times)

Anajune7

  • Hero Member
  • *****
  • Posts: 574
Explain why construction contracts should include a destruction of subject matter clause.
 
  What will be an ideal response?

Question 2

Under what circumstances would contractors be allowed a time extension if a force majeure clause is included in a contract?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

wuly

  • Sr. Member
  • ****
  • Posts: 327
Answer to Question 1

When a construction project is destroyed while it is being built there needs to be a clause that protects contractors from having to perform. A clause that could be included in the construction contract is Destruction of Subject Matter. Projects that would fall under this protection would have been destroyed by fires, unstable conditions, or violent natural acts. If this clause, or some type of similar clause, is not included in a construction contract then a contractor is not relieved from further performance. If a contractor is not discharged from the project because of the destruction of the subject matter then he or she is not able to recover for work that has already been performed on the project. It is also not equitable to require a contractor to start a project over at the original cost of the project, especially if it is several years into a project.

Answer to Question 2

The circumstances under which a contractor would be allowed a time extension if a force majeure clause is included in a contract include acts of God or circumstances beyond the control of contractors such as floods, lightening strikes, hurricanes, earthquakes, tsunamis, monsoons, and tornadoes if they are not common occurrences in a particular geographical area.




Anajune7

  • Member
  • Posts: 574
Reply 2 on: Jul 26, 2018
Thanks for the timely response, appreciate it


bigcheese9

  • Member
  • Posts: 333
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

Amoebae are the simplest type of protozoans, and are characterized by a feeding and dividing trophozoite stage that moves by temporary extensions called pseudopodia or false feet.

Did you know?

Hypertension is a silent killer because it is deadly and has no significant early symptoms. The danger from hypertension is the extra load on the heart, which can lead to hypertensive heart disease and kidney damage. This occurs without any major symptoms until the high blood pressure becomes extreme. Regular blood pressure checks are an important method of catching hypertension before it can kill you.

Did you know?

A strange skin disease referred to as Morgellons has occurred in the southern United States and in California. Symptoms include slowly healing sores, joint pain, persistent fatigue, and a sensation of things crawling through the skin. Another symptom is strange-looking, threadlike extrusions coming out of the skin.

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...
Did you know?

Computer programs are available that crosscheck a new drug's possible trade name with all other trade names currently available. These programs detect dangerous similarities between names and alert the manufacturer of the drug.

For a complete list of videos, visit our video library