Explain why construction contracts should include a destruction of subject matter clause.
 
  What will be an ideal response?

Question 2

Under what circumstances would contractors be allowed a time extension if a force majeure clause is included in a contract?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

wuly

  • Sr. Member
  • ****
  • Posts: 327
Answer to Question 1

When a construction project is destroyed while it is being built there needs to be a clause that protects contractors from having to perform. A clause that could be included in the construction contract is Destruction of Subject Matter. Projects that would fall under this protection would have been destroyed by fires, unstable conditions, or violent natural acts. If this clause, or some type of similar clause, is not included in a construction contract then a contractor is not relieved from further performance. If a contractor is not discharged from the project because of the destruction of the subject matter then he or she is not able to recover for work that has already been performed on the project. It is also not equitable to require a contractor to start a project over at the original cost of the project, especially if it is several years into a project.

Answer to Question 2

The circumstances under which a contractor would be allowed a time extension if a force majeure clause is included in a contract include acts of God or circumstances beyond the control of contractors such as floods, lightening strikes, hurricanes, earthquakes, tsunamis, monsoons, and tornadoes if they are not common occurrences in a particular geographical area.




Anajune7

  • Member
  • Posts: 574
Reply 2 on: Jul 26, 2018
Excellent


Jossy

  • Member
  • Posts: 336
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

Acute bronchitis is an inflammation of the breathing tubes (bronchi), which causes increased mucus production and other changes. It is usually caused by bacteria or viruses, can be serious in people who have pulmonary or cardiac diseases, and can lead to pneumonia.

Did you know?

About 80% of major fungal systemic infections are due to Candida albicans. Another form, Candida peritonitis, occurs most often in postoperative patients. A rare disease, Candida meningitis, may follow leukemia, kidney transplant, other immunosuppressed factors, or when suffering from Candida septicemia.

Did you know?

Every flu season is different, and even healthy people can get extremely sick from the flu, as well as spread it to others. The flu season can begin as early as October and last as late as May. Every person over six months of age should get an annual flu vaccine. The vaccine cannot cause you to get influenza, but in some seasons, may not be completely able to prevent you from acquiring influenza due to changes in causative viruses. The viruses in the flu shot are killed—there is no way they can give you the flu. Minor side effects include soreness, redness, or swelling where the shot was given. It is possible to develop a slight fever, and body aches, but these are simply signs that the body is responding to the vaccine and making itself ready to fight off the influenza virus should you come in contact with it.

Did you know?

Today, nearly 8 out of 10 pregnant women living with HIV (about 1.1 million), receive antiretrovirals.

Did you know?

The first successful kidney transplant was performed in 1954 and occurred in Boston. A kidney from an identical twin was transplanted into his dying brother's body and was not rejected because it did not appear foreign to his body.

For a complete list of videos, visit our video library