What is a common procedure for safeguarding adjacent structures during construction?
 
  What will be an ideal response?

Question 2

If you are representing the owner/engineer, and during the bidding phase of a project, a bidder telephones your office calling attention to what the bidder believes to be an error, and makes a request for clarification or correction, you should:
 
  A. check out the reported error while still on the telephone, give the caller the corrected data orally, then send an addenda to everyone e1se .
   B. deny that an error exists and tell the caller to bid the work as it was specified and make his or her own interpretations.
   C. take all of the information from the caller, then advise him or her to bid the job as it was originally specified unless an addenda is issued, and that if an error was in fact discovered, it will be corrected by addenda which will be mailed to all bidders.
   D. try to be as helpful as possible by checking with the original designer; then, if an error is noted, give the caller the correct information, but do not go out of your way to inform others unless they call with the same question.



mcomstock09

  • Sr. Member
  • ****
  • Posts: 377
Answer to Question 1

Underpinning is required when there are structures adjacent to construction projects since the structural integrity of the soil surrounding the existing structures is compromised when a new site is being excavated adjacent to them. Municipal ordinances or state laws require certain procedures to be followed to underpin adjacent structures if their safety is compromised during construction operations. Contracts should state that the owner is responsible for adjacent structures, and their structural integrity, during construction but owners rely on the contractor to perform the underpinning or owners will hire a separate contractor that specializes in underpinning and have them perform the work.

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Never take aspirin without food because it is likely to irritate your stomach. Never give aspirin to children under age 12. Overdoses of aspirin have the potential to cause deafness.

Did you know?

In 1844, Charles Goodyear obtained the first patent for a rubber condom.

Did you know?

The longest a person has survived after a heart transplant is 24 years.

Did you know?

Human neurons are so small that they require a microscope in order to be seen. However, some neurons can be up to 3 feet long, such as those that extend from the spinal cord to the toes.

Did you know?

All patients with hyperparathyroidism will develop osteoporosis. The parathyroid glands maintain blood calcium within the normal range. All patients with this disease will continue to lose calcium from their bones every day, and there is no way to prevent the development of osteoporosis as a result.

For a complete list of videos, visit our video library