Author Question: The last step in project management includes system ________ and ________. Fill in the blank(s) ... (Read 35 times)

Davideckstein7

  • Hero Member
  • *****
  • Posts: 555
The last step in project management includes system ________ and ________.
 
  Fill in the blank(s) with correct word

Question 2

The second step in any project is coming up with a ________.
 
  Fill in the blank(s) with correct word



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

mohan

  • Sr. Member
  • ****
  • Posts: 362
Answer to Question 1

integration, testing

Answer to Question 2

strategy





 

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

HIV testing reach is still limited. An estimated 40% of people with HIV (more than 14 million) remain undiagnosed and do not know their infection status.

Did you know?

Barbituric acid, the base material of barbiturates, was first synthesized in 1863 by Adolph von Bayer. His company later went on to synthesize aspirin for the first time, and Bayer aspirin is still a popular brand today.

Did you know?

As of mid-2016, 18.2 million people were receiving advanced retroviral therapy (ART) worldwide. This represents between 43–50% of the 34–39.8 million people living with HIV.

Did you know?

The calories found in one piece of cherry cheesecake could light a 60-watt light bulb for 1.5 hours.

For a complete list of videos, visit our video library