This topic contains a solution. Click here to go to the answer

Author Question: All the components of small project management work together: A) asynchronously after definition ... (Read 89 times)

mmm

  • Hero Member
  • *****
  • Posts: 558
All the components of small project management work together:
 
  A) asynchronously after definition is complete.
  B) synchronously, beginning with definition.
  C) synchronously, beginning with strategic planning.
  D) synchronously, beginning with synthesis and testing.

Question 2

Which of the following is one of the reasons a digital clock project is a valuable learning tool for project development?
 
  A) Inexpensive parts B) Low power consumption
  C) Everyone is familiar with clocks D) Low parts count



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Ahernandez18

  • Sr. Member
  • ****
  • Posts: 361
Answer to Question 1

B

Answer to Question 2

C



mmm

  • Hero Member
  • *****
  • Posts: 558
Both answers were spot on, thank you once again




 

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

You should not take more than 1,000 mg of vitamin E per day. Doses above this amount increase the risk of bleeding problems that can lead to a stroke.

Did you know?

Malaria mortality rates are falling. Increased malaria prevention and control measures have greatly improved these rates. Since 2000, malaria mortality rates have fallen globally by 60% among all age groups, and by 65% among children under age 5.

Did you know?

The most destructive flu epidemic of all times in recorded history occurred in 1918, with approximately 20 million deaths worldwide.

Did you know?

Vital signs (blood pressure, temperature, pulse rate, respiration rate) should be taken before any drug administration. Patients should be informed not to use tobacco or caffeine at least 30 minutes before their appointment.

For a complete list of videos, visit our video library