Author Question: A chained schedule ends in a(n) A) SD. B) noncontingent reinforcer. C) terminal reinforcer. ... (Read 58 times)

Jramos095

  • Hero Member
  • *****
  • Posts: 528
A chained schedule ends in a(n)
 
  A) SD.
  B) noncontingent reinforcer.
  C) terminal reinforcer.
  D) behavior scallop.

Question 2

A chained schedule is a sequence of two or more simple schedules, each with its own
 
  A) terminal reinforcer.
  B) SD.
  C) CS.
  D) noncontingent reinforcer.



wfdfwc23

  • Sr. Member
  • ****
  • Posts: 338
Answer to Question 1

C

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Fatal fungal infections may be able to resist newer antifungal drugs. Globally, fungal infections are often fatal due to the lack of access to multiple antifungals, which may be required to be utilized in combination. Single antifungals may not be enough to stop a fungal infection from causing the death of a patient.

Did you know?

In 2010, opiate painkllers, such as morphine, OxyContin®, and Vicodin®, were tied to almost 60% of drug overdose deaths.

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

It is believed that humans initially contracted crabs from gorillas about 3 million years ago from either sleeping in gorilla nests or eating the apes.

Did you know?

As the western states of America were settled, pioneers often had to drink rancid water from ponds and other sources. This often resulted in chronic diarrhea, causing many cases of dehydration and death that could have been avoided if clean water had been available.

For a complete list of videos, visit our video library