Author Question: The push system measures the performance of each work station separately based on measures such as ... (Read 175 times)

wenmo

  • Hero Member
  • *****
  • Posts: 540
The push system measures the performance of each work station separately based on measures such as machine utilization. If all the work stations are operating at the peak of their current possible machine utilization, is this enough to say that this push manufacturing process is at an optimal state? Is there areas that could go wrong?

Question 2

If we examine two or more independent samples to determine if their population means could be equal, we are performing ___________________ ___________________ __.
 Fill in the blank(s) with correct word



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

amynguyen1221

  • Sr. Member
  • ****
  • Posts: 355
Answer to Question 1

basic underlining understanding of push manufacturing

Answer to Question 2

one-way analysis of variance
ANOVA





 

Did you know?

Despite claims by manufacturers, the supplement known as Ginkgo biloba was shown in a study of more than 3,000 participants to be ineffective in reducing development of dementia and Alzheimer’s disease in older people.

Did you know?

In 2006, a generic antinausea drug named ondansetron was approved. It is used to stop nausea and vomiting associated with surgery, chemotherapy, and radiation therapy.

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...
Did you know?

Signs and symptoms of a drug overdose include losing consciousness, fever or sweating, breathing problems, abnormal pulse, and changes in skin color.

Did you know?

There used to be a metric calendar, as well as metric clocks. The metric calendar, or "French Republican Calendar" divided the year into 12 months, but each month was divided into three 10-day weeks. Each day had 10 decimal hours. Each hour had 100 decimal minutes. Due to lack of popularity, the metric clocks and calendars were ended in 1795, three years after they had been first marketed.

For a complete list of videos, visit our video library