This topic contains a solution. Click here to go to the answer

Author Question: A manufacturing plant is trying to determine standard production per day for an incentive program. ... (Read 103 times)

saraeharris

  • Hero Member
  • *****
  • Posts: 546

Question 1

A grocery store is trying to determine how many checkouts per hour its cashiers should perform. The checkout consists of three components; checking, bagging, and payment. A cashier was rated as 80%, 120%, and 95% on the three different components respectively. If a stopwatch timed her as averaging 20 seconds for each component and the store wants a 10% allowance calculate the total standard time.

Question 2

A manufacturing plant is trying to determine standard production per day for an incentive program. Suppose that the incentive program will pay $1 per unit produced above standard rates. A worker is timed at 280 seconds per unit, with a performance rating of 105%. The plant has an allowance factor of 13%. If he produces 100 units in an 8 hour shift, how much would he receive under the incentive plan?


Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by saraeharris on Dec 3, 2019

ASDFGJLO

  • Sr. Member
  • ****
  • Posts: 335
Lorsum iprem. Lorsus sur ipci. Lorsem sur iprem. Lorsum sur ipdi, lorsem sur ipci. Lorsum sur iprium, valum sur ipci et, vala sur ipci. Lorsem sur ipci, lorsa sur iprem. Valus sur ipdi. Lorsus sur iprium nunc, valem sur iprium. Valem sur ipdi. Lorsa sur iprium. Lorsum sur iprium. Valem sur ipdi. Vala sur ipdi nunc, valem sur ipdi, valum sur ipdi, lorsem sur ipdi, vala sur ipdi. Valem sur iprem nunc, lorsa sur iprium. Valum sur ipdi et, lorsus sur ipci. Valem sur iprem. Valem sur ipci. Lorsa sur iprium. Lorsem sur ipci, valus sur iprem. Lorsem sur iprem nunc, valus sur iprium.
Answer Preview
Only 25% of students answer this correctly




saraeharris

  • Member
  • Posts: 546
Reply 2 on: Dec 3, 2019
:D TYSM


milbourne11

  • Member
  • Posts: 322
Reply 3 on: Yesterday
Gracias!

 

Did you know?

Lower drug doses for elderly patients should be used first, with titrations of the dose as tolerated to prevent unwanted drug-related pharmacodynamic effects.

Did you know?

After 5 years of being diagnosed with rheumatoid arthritis, one every three patients will no longer be able to work.

Did you know?

Approximately 70% of expectant mothers report experiencing some symptoms of morning sickness during the first trimester of pregnancy.

Did you know?

The lipid bilayer is made of phospholipids. They are arranged in a double layer because one of their ends is attracted to water while the other is repelled by water.

Did you know?

As of mid-2016, 18.2 million people were receiving advanced retroviral therapy (ART) worldwide. This represents between 43–50% of the 34–39.8 million people living with HIV.

For a complete list of videos, visit our video library