Author Question: If you have a spare 10 minutes before a lunch meeting and you have a two day project coming up that ... (Read 47 times)

Garrulous

  • Hero Member
  • *****
  • Posts: 686
If you have a spare 10 minutes before a lunch meeting and you have a two day project coming up that you have not started how would you use the spare time?
 
  What will be an ideal response?

Question 2

When prioritizing assignments you need to break them down so that they _______.
 
  A) Can never be reorganized B) Are in three to five categories
  C) Are not in any logical groups D) None of the above



DylanD1323

  • Sr. Member
  • ****
  • Posts: 314
Answer to Question 1

Take the time to do something toward the completion of the lager project. Make a timeline, review what files you may need etc. Do something by taking a small bite out of the project.

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

In 1864, the first barbiturate (barbituric acid) was synthesized.

Did you know?

Approximately 25% of all reported medication errors result from some kind of name confusion.

Did you know?

People often find it difficult to accept the idea that bacteria can be beneficial and improve health. Lactic acid bacteria are good, and when eaten, these bacteria improve health and increase longevity. These bacteria included in foods such as yogurt.

Did you know?

Side effects from substance abuse include nausea, dehydration, reduced productivitiy, and dependence. Though these effects usually worsen over time, the constant need for the substance often overcomes rational thinking.

Did you know?

To maintain good kidney function, you should drink at least 3 quarts of water daily. Water dilutes urine and helps prevent concentrations of salts and minerals that can lead to kidney stone formation. Chronic dehydration is a major contributor to the development of kidney stones.

For a complete list of videos, visit our video library