The critical path
 a. is any path that goes from the starting node to the completion node.
  b. is a combination of all paths.
  c. is the shortest path.
  d. is the longest path.

Question 2

Which of the following is NOT a required assumption for the analysis of variance?
 a. The random variable of interest for each population has a normal probability distribution.
  b. The variance associated with the random variable must be the same for each population.
  c. At least two populations are under consideration.
  d. Populations have equal means.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

momo1250

  • Sr. Member
  • ****
  • Posts: 338
Answer to Question 1

D

Answer to Question 2

d




panfilo

  • Member
  • Posts: 572
Reply 2 on: Jun 24, 2018
YES! Correct, THANKS for helping me on my review


Joy Chen

  • Member
  • Posts: 354
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

The first oncogene was discovered in 1970 and was termed SRC (pronounced "SARK").

Did you know?

The term pharmacology is derived from the Greek words pharmakon("claim, medicine, poison, or remedy") and logos ("study").

Did you know?

Vital signs (blood pressure, temperature, pulse rate, respiration rate) should be taken before any drug administration. Patients should be informed not to use tobacco or caffeine at least 30 minutes before their appointment.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

Liver spots have nothing whatsoever to do with the liver. They are a type of freckles commonly seen in older adults who have been out in the sun without sufficient sunscreen.

For a complete list of videos, visit our video library