Author Question: The shift supervisor at a local manufacturing plant collected data on the number of defects coming ... (Read 39 times)

jwb375

  • Hero Member
  • *****
  • Posts: 540
The shift supervisor at a local manufacturing plant collected data on the number of defects coming off an assembly line over the past eight weeks (40 work days). She summarized the data in the following frequency table.
 
   of Errors 0 1 2 3 4 5
   of Weeks 1 4 7 16 10 2
 
  What is the weighted average number of errors per night?

Question 2

What is the width of the interval?
 
  A) 4.86
  B) 2.56
  C) 3.24
  D) 6.48



ally

  • Sr. Member
  • ****
  • Posts: 331
Answer to Question 1

Weighted mean = 2.9

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Your chance of developing a kidney stone is 1 in 10. In recent years, approximately 3.7 million people in the United States were diagnosed with a kidney disease.

Did you know?

Fatal fungal infections may be able to resist newer antifungal drugs. Globally, fungal infections are often fatal due to the lack of access to multiple antifungals, which may be required to be utilized in combination. Single antifungals may not be enough to stop a fungal infection from causing the death of a patient.

Did you know?

Patients who have been on total parenteral nutrition for more than a few days may need to have foods gradually reintroduced to give the digestive tract time to start working again.

Did you know?

The word drug comes from the Dutch word droog (meaning "dry"). For centuries, most drugs came from dried plants, hence the name.

Did you know?

Glaucoma is a leading cause of blindness. As of yet, there is no cure. Everyone is at risk, and there may be no warning signs. It is six to eight times more common in African Americans than in whites. The best and most effective way to detect glaucoma is to receive a dilated eye examination.

For a complete list of videos, visit our video library