Which of the following requirements must be met to allow new construction in a prevention of significant destruction area:
a. the owner must agree to install the best available control technologyas determined by the EPAon the new plant to control its air pollution
b. the owner must show that the pollution from its plant will not cause the maximum allowable increase in the area to be exceeded
c. the owner must show how the plant will be economically beneficial to the area d. both a and b are required
e. a, b, and c are required
Question 2
As a result of the Supreme Court case Dow Chemical v. U.S., administrative agencies are required to obtain a search warrant before they conducted observations.
a. True
b. False
Indicate whether the statement is true or false