Author Question: In a CPM or PERT project, a network is a graphical representation that shows how each individual ... (Read 33 times)

c0205847

  • Hero Member
  • *****
  • Posts: 531
In a CPM or PERT project, a network is a graphical representation that shows how each individual activity relates in time and sequence to all other activities.
 a. True
  b. False
 Indicate whether the statement is true or false

Question 2

The channel manager's specification of distribution tasks is:
 a. Situationally dependent.
  b. Generalizable across most situations.
  c. One of choosing from among the eight basic marketing functions.
  d. Based mainly on what the existing channel members want.
  e. The first phase of channel design.



Zebsrer

  • Sr. Member
  • ****
  • Posts: 284
Answer to Question 1

True

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

Persons who overdose with cardiac glycosides have a better chance of overall survival if they can survive the first 24 hours after the overdose.

Did you know?

Normal urine is sterile. It contains fluids, salts, and waste products. It is free of bacteria, viruses, and fungi.

Did you know?

The longest a person has survived after a heart transplant is 24 years.

Did you know?

Nearly 31 million adults in America have a total cholesterol level that is more than 240 mg per dL.

For a complete list of videos, visit our video library