Author Question: If an organization purchases a software package and does not modify or add to the package in-house, ... (Read 35 times)

jessicacav

  • Hero Member
  • *****
  • Posts: 558
If an organization purchases a software package and does not modify or add to the package in-house, the construction phase then is often limited to which step?
 
  A) system design
  B) system building
  C) system testing
  D) feasibility analysis

Question 2

When to abandon a legacy system, versus continuing to incur application maintenance costs, is a key application management issue.
 
  Indicate whether the statement is true or false



polinasid

  • Sr. Member
  • ****
  • Posts: 344
Answer to Question 1

C

Answer to Question 2

FALSE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

To maintain good kidney function, you should drink at least 3 quarts of water daily. Water dilutes urine and helps prevent concentrations of salts and minerals that can lead to kidney stone formation. Chronic dehydration is a major contributor to the development of kidney stones.

Did you know?

More than 30% of American adults, and about 12% of children utilize health care approaches that were developed outside of conventional medicine.

Did you know?

In 1885, the Lloyd Manufacturing Company of Albany, New York, promoted and sold "Cocaine Toothache Drops" at 15 cents per bottle! In 1914, the Harrison Narcotic Act brought the sale and distribution of this drug under federal control.

Did you know?

The first-known contraceptive was crocodile dung, used in Egypt in 2000 BC. Condoms were also reportedly used, made of animal bladders or intestines.

Did you know?

In 1864, the first barbiturate (barbituric acid) was synthesized.

For a complete list of videos, visit our video library