Author Question: During the review of the previous budget with the actual numbers to determine variances, a price ... (Read 63 times)

azncindy619

  • Hero Member
  • *****
  • Posts: 562
During the review of the previous budget with the actual numbers to determine variances, a price variance was discovered on the Orthopedic Unit. Which of the following scenarios might have resulted in this type of variance?
 
  1. The minimum wage increased by 4, and this affected the wages of three patient care assistants.
  2. The cost of Foley catheter insertion kits increased by 9 during the last year.
  3. The number of knee replacements performed decreased by 14.
  4. The unit began accepting postoperative clients from the Surgical Intensive Care Unit.

Question 2

The nurse managers are discussing the health care organization's recent adoption of a zero-based budget. Which of the following statements is most closely associated with a zero-based budget?
 
  1. It doesn't take very long to do this type of budget.
  2. The most difficult part about this type of budget is trying to find strong rationale to keep something I've had for the last 3 years.
  3. It's nice to be able to adjust from the information I've used in the previous budget report.
  4. I can just focus on this department. I don't have to worry about coordinating my budget with any other manager.



lucas dlamini

  • Sr. Member
  • ****
  • Posts: 327
Answer to Question 1

Answer: 2

Rationale: There are four types of variances: mix variance, volume variance, cost variance, and price variance. A price variance occurs when the actual amount of money paid for a product or service varies from the projected expense. When the price increased to buy a Foley catheter insertion tray, it produced a price variance. A cost variance occurs when labor rates increase or decrease. A mix variance or volume variance can occur as a result of a change in the type of clients the unit serves. Volume variances typically occur based on a change in a specific type of utilization rate of some service.

Answer to Question 2

Answer: 2

Rationale: A zero-based budget is difficult to create because each expense must be re-justified to continue to spend the money again in the future. This budget is very time-consuming to produce. It can result in major changes in plans or direction, and other interacting departments must be included while creating this type of budget. The other type of budget is a flexible-based budget. This is created by using information from previous budget reports to come up with the new budget. This is much less time-consuming and easier to produce. This type of budget is done through a series of adjustments from the previous budget report.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

Asthma occurs in one in 11 children and in one in 12 adults. African Americans and Latinos have a higher risk for developing asthma than other groups.

Did you know?

According to the National Institute of Environmental Health Sciences, lung disease is the third leading killer in the United States, responsible for one in seven deaths. It is the leading cause of death among infants under the age of one year.

Did you know?

Vital signs (blood pressure, temperature, pulse rate, respiration rate) should be taken before any drug administration. Patients should be informed not to use tobacco or caffeine at least 30 minutes before their appointment.

Did you know?

More than 2,500 barbiturates have been synthesized. At the height of their popularity, about 50 were marketed for human use.

For a complete list of videos, visit our video library