Author Question: Which phase of the program planning process is being used when the provider and client consider the ... (Read 18 times)

lunatika

  • Hero Member
  • *****
  • Posts: 548
Which phase of the program planning process is being used when the provider and client consider the possibilities of solving a problem using one of the solutions identified?
 
  a. Conceptualization
  b. Detailing
  c. Implementation
  d. Evaluation

Question 2

The chi-square test is used to test the null hypothesis that:
 
  a. The medians of groups being compared are equal
  b. Two categorical variables are independent (not related)
  c. The expected cell sizes are zero
  d. The odds ratio is zero



Chocorrol77

  • Sr. Member
  • ****
  • Posts: 313
Answer to Question 1

B
The provider details the costs, resources, and program activities needed to choose one of the so-lutions from the conceptualizing phase.

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Sperm cells are so tiny that 400 to 500 million (400,000,000–500,000,000) of them fit onto 1 tsp.

Did you know?

Cutaneous mucormycosis is a rare fungal infection that has been fatal in at least 29% of cases, and in as many as 83% of cases, depending on the patient's health prior to infection. It has occurred often after natural disasters such as tornados, and early treatment is essential.

Did you know?

The most destructive flu epidemic of all times in recorded history occurred in 1918, with approximately 20 million deaths worldwide.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

In 2010, opiate painkllers, such as morphine, OxyContin®, and Vicodin®, were tied to almost 60% of drug overdose deaths.

For a complete list of videos, visit our video library