Author Question: When planning for the use of portfolios, one major consideration is a. whether selection-type ... (Read 27 times)

RRMR

  • Hero Member
  • *****
  • Posts: 557
When planning for the use of portfolios, one major consideration is
 
  a. whether selection-type items will be used
  b. the construct-related validity of portfolio entries
  c. the criteria used to score portfolio entries
  d. whether a table of specifications will be constructed

Question 2

Typically, creating and maintaining portfolios require considerable
 
  a. parent-teacher collaboration
  b. student-student collaboration
  c. teacher-teacher collaboration
  d. student-teacher collaboration



bdobbins

  • Sr. Member
  • ****
  • Posts: 326
Answer to Question 1

C

Answer to Question 2

D



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Barbituric acid, the base material of barbiturates, was first synthesized in 1863 by Adolph von Bayer. His company later went on to synthesize aspirin for the first time, and Bayer aspirin is still a popular brand today.

Did you know?

Liver spots have nothing whatsoever to do with the liver. They are a type of freckles commonly seen in older adults who have been out in the sun without sufficient sunscreen.

Did you know?

Always store hazardous household chemicals in their original containers out of reach of children. These include bleach, paint, strippers and products containing turpentine, garden chemicals, oven cleaners, fondue fuels, nail polish, and nail polish remover.

Did you know?

It is difficult to obtain enough calcium without consuming milk or other dairy foods.

Did you know?

Elderly adults are at greatest risk of stroke and myocardial infarction and have the most to gain from prophylaxis. Patients ages 60 to 80 years with blood pressures above 160/90 mm Hg should benefit from antihypertensive treatment.

For a complete list of videos, visit our video library