Author Question: After assessing the risks of a project, the second step is to ________ each risk, or to think about ... (Read 103 times)

Lisaclaire

  • Hero Member
  • *****
  • Posts: 569
After assessing the risks of a project, the second step is to ________ each risk, or to think about whether the adverse impact will be major or minor.
 Fill in the blank(s) with correct word

Question 2

Which president stated that consumers have the right to service?
 A) Franklin D. Roosevelt
  B) John F. Kennedy
  C) Lyndon B. Johnson
  D) Gerald R. Ford
  E) Bill Clinton



hanadaa

  • Sr. Member
  • ****
  • Posts: 339
Answer to Question 1

prioritize

Answer to Question 2

E



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

After 5 years of being diagnosed with rheumatoid arthritis, one every three patients will no longer be able to work.

Did you know?

As the western states of America were settled, pioneers often had to drink rancid water from ponds and other sources. This often resulted in chronic diarrhea, causing many cases of dehydration and death that could have been avoided if clean water had been available.

Did you know?

Many of the drugs used by neuroscientists are derived from toxic plants and venomous animals (such as snakes, spiders, snails, and puffer fish).

Did you know?

Nitroglycerin is used to alleviate various heart-related conditions, and it is also the chief component of dynamite (but mixed in a solid clay base to stabilize it).

Did you know?

In 1835 it was discovered that a disease of silkworms known as muscardine could be transferred from one silkworm to another, and was caused by a fungus.

For a complete list of videos, visit our video library