Author Question: The project manager must ensure that historical information reported _____. a. reflects ... (Read 71 times)

meagbuch

  • Hero Member
  • *****
  • Posts: 568
The project manager must ensure that historical information reported _____.
 
  a. reflects performance in the field
  b. will validate project estimates
  c. supports the bidding process
  d. alerts management regarding outside contractor bids

Question 2

A project manager can control overruns by _____.
 
  a. tracking actual costs
  b. tracking estimated costs
  c. tracking projected costs
  d. reviewing historical cost data



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

karmakat49

  • Sr. Member
  • ****
  • Posts: 369
Answer to Question 1

a

Answer to Question 2

a




meagbuch

  • Member
  • Posts: 568
Reply 2 on: Jul 24, 2018
Thanks for the timely response, appreciate it


adammoses97

  • Member
  • Posts: 337
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

Adult head lice are gray, about ? inch long, and often have a tiny dot on their backs. A female can lay between 50 and 150 eggs within the several weeks that she is alive. They feed on human blood.

Did you know?

The average office desk has 400 times more bacteria on it than a toilet.

Did you know?

It is difficult to obtain enough calcium without consuming milk or other dairy foods.

Did you know?

Alcohol acts as a diuretic. Eight ounces of water is needed to metabolize just 1 ounce of alcohol.

For a complete list of videos, visit our video library