Author Question: To provide a direct load path through the framing system, the preferred method is _____. a. ... (Read 38 times)

jwb375

  • Hero Member
  • *****
  • Posts: 540
To provide a direct load path through the framing system, the preferred method is _____.
 
  a. staggered-stud framing
  b. in-line framing
  c. cantilevering
  d. offset framing

Question 2

The tool used to prevent separation (screw jacking) when two layers of steel are screwed together is the
  _____.
 
  a. channel clip
  b. framing vise
  c. locking C-clamp
  d. stud crimper



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

leeeep

  • Sr. Member
  • ****
  • Posts: 315
Answer to Question 1

b

Answer to Question 2

c




jwb375

  • Member
  • Posts: 540
Reply 2 on: Jul 24, 2018
Wow, this really help


blakcmamba

  • Member
  • Posts: 335
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

To maintain good kidney function, you should drink at least 3 quarts of water daily. Water dilutes urine and helps prevent concentrations of salts and minerals that can lead to kidney stone formation. Chronic dehydration is a major contributor to the development of kidney stones.

Did you know?

Normal urine is sterile. It contains fluids, salts, and waste products. It is free of bacteria, viruses, and fungi.

Did you know?

The longest a person has survived after a heart transplant is 24 years.

Did you know?

Barbituric acid, the base material of barbiturates, was first synthesized in 1863 by Adolph von Bayer. His company later went on to synthesize aspirin for the first time, and Bayer aspirin is still a popular brand today.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

For a complete list of videos, visit our video library