The air-conditioning system rough-in work normally begins:
A) After all the interior walls are complete.
B) After the house is completely dried in.
C) After most of the interior finish work is completed.
D) After the house is framed.
Question 2
The current relay coil is wired:
A) In series with the start winding. B) In series with the run winding.
C) In parallel with the start winding. D) In parallel with the run winding.